Please Choose Your Language

We Have List The Following FAQs For Your Reference

If you still have questions, please feel free to contact us.
Our dedicated sales team and professional technicians are always at your service.
Home / Service / FAQ / Rotogravure Printing Machine

FAQ

  • How long is the delivery time of your machines?

    Our delivery time depends on the specific time of the order, generally 4-6 months after the payment of the deposit will be delivered.
  • What about your after-sales service?

    Permanent after-sales service guarantee system, 24 hours online technical service team to solve general problems, if necessary, engineers can arrive at the scene within a week to solve the problem.
  • What is the biggest feature of your machine?

    We have a world-class intelligent CNC center, all parts can be machined with super high precision, and all of our design concepts are dedicated to reducing costs and increasing efficiency for our customers.
  • How is the control system of your machines?

    All of our machines are equipped with electronic shaft  servo control system (ELS)  which integrates drive, tension control and color registration, and the control system is from famous European or Chinese brands, and after repeated tests, our  control system is stable, reliable and easy to operate.
  • Do you test your machines after assembly?

    After the machine is assembled, the standard model will be tested empty and then be shipped directly to the customer's factory for test run , while for special customized models we will test the machine before shipment according to the actual situation.
Company Consulting News
December 12, 2024

In the continuous innovation of the packaging industry, Oyang fully automatic no-crease sheet feeding paper bag making machine leads the future of paper bag manufacturing with its excellent performance and innovative technology. 

December 31, 2024

The history of paper die-cutting machines is a fascinating journey, marked by technological advancements and the growing demand for precision in packaging and design. From its inception to the present, these machines have evolved into indispensable tools across global industries. Early BeginningsThe

December 27, 2024

In an era of such fierce market competition, the key for enterprises to maintain their competitive advantage lies in continuous learning and progress. Oyang Group is a model of excellence and a pioneer in the spirit of perpetual education. From December 23 to 25, Oyang Group invited a team of senior experts from Huawei to work with the management of Oyang Group to carry out a three-day strategic improvement training. This is not only an academic feast, but also a spiritual baptism, which demonstrates Oyang Group's determination to learn and grow.

Ready to Start Your Project Now?

Provide high quality intelligent solutions for packing and printing industry.

Quick Links

Leave a Message
Contact us

Production Lines

Contact Us

Email: inquiry@oyang-group.com
Phone: +86-15058933503
Whatsapp: +86-15058933503
Get In Touch
Copyright © 2024 Oyang Group Co.,Ltd. All rights reserved.  Privacy Policy